Marine Construction Projects

  1. September 2014 – Scappoose Bay Marina Dock Extensions

    MIC extended one dock at the Scappoose Bay Marine by fifty feet. Construction included driving three new pile, one for the dock extension and two elsewhere inside the facility, installation of new pile hoops and decking. The new dock was built to match the existing dock built 20+ years prior. The new dock was also […]

  2. July 2014 – City of Wilsonville – Emergency Outfall Repairs

    MIC was awarded a contract to perform emergency outfall repairs. Work consisted of providing derrick barge services to demo the existing in water portion of the outfall and patch and replace the damaged pipe with a similar kind of material. In addition to replacement of the pipe MIC installed stream bank erosion countermeasures. Work was […]

  3. March 2015 – McNary Dam – Downstream Navlock Interim Repairs

    DESCRIPTION OF WORK: Perform structural and mechanical interim repairs on the McNary Navigation Lock Downstream Gate. The McNary Navigation Lock Downstream Gate is a two-leaf arched miter gate and measures 106 feet tall by 86 feet wide and was placed in service in 1954. Miter Gate Gudgeon Repairs — Procedures include line boring the perpendicular […]

  4. May 2014 – NWP-USACE-Portable Floating Fish Collector Cougar Reservoir

    USACE-Portable Floating Fish Collector Cougar Reservoir, 2013. Customized system mobilization and placement for fish collector. This includes boat and crane work for placement of submerged anchors and underwater (diving) coordination. Total Project $217,523

  5. March 2014 – NWW-USACE McNary Dam Oregon Shore Lamprey Prototype

    McNary Oregon Shores Fishway, 2014, Fishway Lamprey pro-type entrance structure. Including fabrication and installation, of multi-piece aluminum structure, removal of stock log, dive coordination, repair on concrete sill and infill repair on smooth edge. Total Project $336,542.   Prototype lamprey passage structure installed at McNary Dam Columbia Basin Bulletin Saturday, March 1, 2014 Pacific lamprey […]